Document the schema, value types, and render semantics so a Macroplan .toml can be produced and consumed outside this app's renderer. Ships a JSON Schema (served from public/ for editor use) and a reference file.
155 lines
9.7 KiB
Markdown
155 lines
9.7 KiB
Markdown
# Macroplan TOML Format — v1
|
|
|
|
The portable, tool-independent definition of a **Macroplan**: a week-by-week
|
|
delivery plan that records what a team promised, every time an estimate slipped,
|
|
and when work actually shipped — judged against the **first** estimate, never a
|
|
moved goalpost.
|
|
|
|
This document is the contract. Any tool can produce or consume a `.toml` file
|
|
that conforms to it and render the same plan. The [macroplan app](../README.md)
|
|
is one such consumer; nothing here is specific to it.
|
|
|
|
- **Machine-readable schema:** [`macroplan.schema.json`](../public/macroplan.schema.json),
|
|
served at `https://macroplan.apoena.dev/macroplan.schema.json` (JSON Schema
|
|
2020-12; validates the TOML-decoded structure).
|
|
- **Reference file:** [`macroplan.example.toml`](macroplan.example.toml)
|
|
(exercises every field and state; a conformance sample).
|
|
- **Serialization:** [TOML v1.0.0](https://toml.io). Values use TOML's native
|
|
types — dates are **bare date literals**, not quoted strings (see _Dates_).
|
|
|
|
## Versioning
|
|
|
|
A file MAY declare the format version at the top level:
|
|
|
|
```toml
|
|
macroplan_version = 1
|
|
```
|
|
|
|
- **Optional.** An absent marker means the current version (`1`). Every existing
|
|
file therefore stays valid.
|
|
- **Integer**, monotonically increasing. This document defines version **1**.
|
|
- A consumer that understands version _N_ **MUST reject** a file declaring a
|
|
version **greater than** _N_ (rather than silently mis-rendering it), and
|
|
SHOULD accept any version ≤ _N_ it still supports.
|
|
- The version is bumped only for a **breaking** change to the schema or render
|
|
semantics below — a new optional field does not require a bump.
|
|
|
|
Producers SHOULD emit `macroplan_version` so a file self-describes its target.
|
|
|
|
## Top-level fields
|
|
|
|
| Key | Required | Type | Default | Meaning |
|
|
| ------------------- | -------- | ------------- | ---------------------- | ------------------------------------------------------------------------------------- |
|
|
| `macroplan_version` | no | integer (`1`) | `1` | Format version (see above). |
|
|
| `title` | no | string | `"Untitled Macroplan"` | Display name of the plan. |
|
|
| `start` | no | date | auto-fit | Left edge of the plan's week span. **Only extends** the span; never clips a feature. |
|
|
| `end` | no | date | auto-fit | Right edge of the plan's week span. **Only extends** the span; never clips a feature. |
|
|
|
|
Zero or more `[[feature]]` blocks and zero or more `[[milestone]]` blocks follow.
|
|
|
|
## `[[feature]]`
|
|
|
|
A unit of work, read left-to-right as a story: where it started, what was first
|
|
promised, every slip, and when it shipped.
|
|
|
|
| Key | Required | Type | Default | Meaning |
|
|
| ------------- | -------- | -------------------------------------------- | ------- | ------------------------------------------------------------------------------------------------------------------------------------------ |
|
|
| `name` | **yes** | non-empty string | — | Identifies the feature; the **join key** for a milestone's `requires`. |
|
|
| `start` | **yes** | date | — | The week work began. |
|
|
| `original` | **yes** | date | — | The **Original Estimate** — the immovable baseline all lateness is judged against ([ADR-0001](adr/0001-original-estimate-as-baseline.md)). |
|
|
| `reestimates` | no | array of dates | `[]` | Each later week the estimate slipped to (a slip, `△`). Order-independent. |
|
|
| `delivered` | no | date | — | The week the feature actually shipped. Absent → still in flight. |
|
|
| `learning` | no | string | — | A post-delivery takeaway. |
|
|
| `status` | no | `"on-track"` \| `"at-risk"` \| `"off-track"` | — | In-flight confidence. Meaningful only while undelivered. |
|
|
| `note` | no | string | — | A short note accompanying `status`. |
|
|
|
|
**Constraint — unique names:** feature `name` values MUST be unique within a
|
|
plan. Because milestone `requires` resolves by name, a duplicate would make a
|
|
requirement ambiguous. Conforming consumers reject duplicates.
|
|
|
|
## `[[milestone]]`
|
|
|
|
A dated checkpoint that depends on a set of features being delivered by then.
|
|
|
|
| Key | Required | Type | Default | Meaning |
|
|
| ---------- | -------- | ---------------- | ------- | ------------------------------------------------------------------- |
|
|
| `name` | **yes** | non-empty string | — | Display name of the milestone. |
|
|
| `week` | **yes** | date | — | When the milestone falls due. |
|
|
| `requires` | no | array of strings | `[]` | Feature `name`s that must be delivered on/before `week` to meet it. |
|
|
|
|
A `requires` entry that names no existing feature counts as **unmet** (it can
|
|
never be satisfied) — useful for catching typos.
|
|
|
|
## Value types
|
|
|
|
### Dates → weeks
|
|
|
|
Every date field is a **calendar date**, written as a TOML bare date literal:
|
|
|
|
```toml
|
|
original = 2026-06-15
|
|
reestimates = [2026-06-29, 2026-07-13]
|
|
```
|
|
|
|
- **Canonical form is the bare date literal.** A quoted `"2026-06-15"` string is
|
|
_tolerated_ on input for convenience, but producers SHOULD emit bare literals
|
|
so the same plan always serializes identically.
|
|
- **Any day snaps to its ISO-week Monday.** A Macroplan's unit is the week, keyed
|
|
by the Monday (yyyy-mm-dd) of the ISO week containing the date. `2026-06-17`
|
|
(a Wednesday) and `2026-06-15` (that Monday) denote the **same week**. Every
|
|
conforming renderer MUST apply this snapping, or dates land in the wrong column.
|
|
|
|
### Status
|
|
|
|
The enum `on-track` \| `at-risk` \| `off-track`. No other value is valid. Lateness
|
|
is **derived, never authored** — there is deliberately no "late" status.
|
|
|
|
## Render semantics (the contract a renderer must honor)
|
|
|
|
Two tools should draw the same plan from the same file. These rules are as much
|
|
a part of the format as the fields:
|
|
|
|
1. **On-time vs. late is judged only against `original`** — never a re-estimate
|
|
([ADR-0001](adr/0001-original-estimate-as-baseline.md)). `delivered ≤ original`
|
|
(by week) is on time; `delivered > original` is late.
|
|
2. **Marker vocabulary** per feature:
|
|
- `◯` **original** — the Original Estimate week, while undelivered.
|
|
- `△` **re-estimate** — one per `reestimates` entry.
|
|
- `◉` **delivered on time** — a delivery on/before `original`. It **subsumes**
|
|
the `◯` (no separate original marker is drawn).
|
|
- `▲` **delivered late** — a delivery after `original`; the `◯` baseline is
|
|
**kept** alongside it.
|
|
3. **Bar extent.** A feature's bar runs from `start` to its furthest marker. A
|
|
delivered bar ends at its delivery. An **overdue** feature (undelivered, and
|
|
already past its furthest estimate relative to "now") keeps running to the
|
|
current week.
|
|
4. **Plan span.** The rendered week range runs from the earliest to the latest
|
|
week among all features' markers and all milestones. Optional `start`/`end`
|
|
only widen this range with lead-in / trailing weeks; a marker outside them is
|
|
never clipped.
|
|
5. **Milestone met/unmet.** A required feature is **unmet** at a milestone if it
|
|
is undelivered, delivered _after_ the milestone `week`, or names no existing
|
|
feature.
|
|
6. **"Now".** The current week (Monday of today) drives overdue extension and the
|
|
"now" line. It is contextual, not stored in the file.
|
|
|
|
## Notes for implementers
|
|
|
|
- **Unknown keys.** The JSON Schema is strict (`additionalProperties: false`) so
|
|
editors flag typos like `titel`. The reference parser is more lenient — it
|
|
ignores unrecognized top-level keys. Producers SHOULD NOT emit unknown keys.
|
|
- **Empty plan.** A file with no features and no milestones is valid; with an
|
|
authored `start`/`end` it renders as an empty grid across that span.
|
|
- **Editor integration.** Point [Taplo](https://taplo.tamasfe.dev)-based editors
|
|
at the schema with a directive on the first line of a plan file:
|
|
`#:schema https://macroplan.apoena.dev/macroplan.schema.json`.
|
|
|
|
## See also
|
|
|
|
- [CONTEXT.md](../CONTEXT.md) — the ubiquitous language (Feature, Original
|
|
Estimate, Re-estimate, Delivery, Milestone, Week, Status, Learning).
|
|
- [ADR-0001](adr/0001-original-estimate-as-baseline.md) — why lateness is judged
|
|
against the Original Estimate.
|
|
- [ADR-0002](adr/0002-local-first-no-backend.md) — why the `.toml` file is the
|
|
portable source of truth.
|